Slated for operation commencement in October 2022, the project’s construction spans across multiple communes in Tien Giang Province. Spearheaded by Thanh Thanh Cong Group, the project boasts a 100 MW capacity, promising an annual generation of 307.6 million kWh. PC1 is tasked with a suite of responsibilities, including technical design, legal services, procurement, and overseeing the construction, manufacturing, installation, testing, commissioning, and COD of the facility.
The Tan Phu Dong 1 Wind Power Plant Project encompasses several key components: it will feature 24 wind turbines, each covering approximately 200 square meters. The infrastructure includes a 35KV power line, an operational management building, and a 35/110KV transformer station spread over roughly 3 hectares. Additionally, there will be a 110KV power line supported by columns across an area of about 4.5 hectares. As per the official Decision, the project is granted a 50-year operational tenure, commencing from the investment policy decision date.